Legislature(2019 - 2020)FAHRENKAMP 203

02/12/2020 09:00 AM Senate RAILBELT ELECTRIC SYSTEM

Note: the audio and video recordings are distinct records and are obtained from different sources. As such there may be key differences between the two. The audio recordings are captured by our records offices as the official record of the meeting and will have more accurate timestamps. Use the icons to switch between them.

Download Mp3. <- Right click and save file as

Audio Topic
09:04:56 AM Start
09:05:31 AM SB123
09:29:39 AM Adjourn
* first hearing in first committee of referral
+ teleconferenced
= bill was previously heard/scheduled
-- Please Note Location Change --
+= SB 123 ELECTRIC RELIABILITY ORGANIZATIONS TELECONFERENCED
Heard & Held
-- Public Testimony --
                 SB 123-ELECTRIC RELIABILITY ORGANIZATIONS                                                                  
                                                                                                                                
     9:05:31 AM                                                                                                               
     CHAIR  COGHILL announced  the consideration  of  SENATE BILL  NO.                                                          
     123, "An  Act relating  to the  regulation of  electric utilities                                                          
     and  electric reliability  organizations;  and  providing for  an                                                          
     effective date."                                                                                                           
                                                                                                                                
     He  solicited  a  motion  to   adopt  the  work  draft  committee                                                          
     substitute and noted that it generated a new title.                                                                        
                                                                                                                                
     9:06:07 AM                                                                                                               
     SENATOR  MICCICHE  moved  to  adopt   the  work  draft  committee                                                          
     substitute  (CS)  for SB  123,  work  order 31-LS0959\K,  as  the                                                          
     working document.                                                                                                          
                                                                                                                                
     9:06:30 AM                                                                                                               
     CHAIR COGHILL objected for an explanation of the changes.                                                                  
                                                                                                                                
     9:06:57 AM                                                                                                               
RENA  MILLER,   Staff,  Senator   Cathy  Giessel,   Alaska  State                                                               
Legislature, Juneau,  Alaska, and  on loan  to the  committee for                                                               
the purposes  of SB 123,  reviewed the following  changes between                                                               
Version M and Version K:                                                                                                        
                                                                                                                                
     Throughout: Changed  references to 'bulk  power system'                                                                    
     and    'interconnected    bulk   power    system'    to                                                                    
     'interconnected bulk electric system'                                                                                      
                                                                                                                                
CHAIR COGHILL asked if this comports with RCA terminology.                                                                      
                                                                                                                                
MS. MILLER answered yes. She continued:                                                                                         
                                                                                                                                
     Page 1,  lines 1-5: [At the  Chair's request} redrafted                                                                    
     a  more descriptive  title. Page  1,  line 11:  Changed                                                                    
     'certified'  to 'certificated'  [to conform  with other                                                                    
     RCA statutes].                                                                                                             
                                                                                                                                
     Page 1, line11, to page 2, line 1:                                                                                         
                                                                                                                                
     Added provision  specifying that  a group  of utilities                                                                    
     all  of  which  are  exempt as  municipal  entities  or                                                                    
     political  subdivisions of  the state  are exempt  from                                                                    
     the requirement to participate in an ERO.                                                                                  
                                                                                                                                
She  explained the  drafters will  relocate this  provision to  a                                                               
more appropriate section  of the bill. Instead  of addressing the                                                               
requirement  of  utilities  to   participate,  it  addresses  the                                                               
requirement to actually have an ERO.                                                                                            
                                                                                                                                
     Page 2, line 4: Changed 'certify' to 'certificate'.                                                                        
                                                                                                                                
     Page 2, line 5: Changed 'certify' to 'certificate'.                                                                        
                                                                                                                                
     Page  2,  lines  7-8:   Restructured  to  separate  the                                                                    
     provisions  for  applications  and  approval  from  the                                                                    
     requirements  an ERO  must demonstrate  in order  to be                                                                    
     approved. [A new subsection (c) is created.]                                                                               
                                                                                                                                
     Page 2, line 24: Changed [] to [].                                                                                         
                                                                                                                                
     Page 3,  lines 2-4: Added  requirement for the  RCA to,                                                                    
     once  regulations are  written and  bill is  in effect,                                                                    
     notify the [interconnected]  load-serving entities in a                                                                    
     system that an ERO is required.                                                                                            
                                                                                                                                
          Page 3,  line 5:  Added 'and certificate'  after 'form'                                                               
          to  clarify an  ERO  formed  by the  RCA  also must  be                                                               
          certificated.                                                                                                         
                                                                                                                                
          Page 3,  lines 7-12: Restructured  provisions directing                                                               
          the RCA to form an  ERO. The previous bill required the                                                               
          RCA to form an  ERO if no one had applied  to be an ERO                                                               
          within  three   months.  The  CS  applies   the  notice                                                               
          requirement  in (d)  on page  2; once  notice has  been                                                               
          given,  the  RCA will  form  an  ERO  [if] no  one  has                                                               
          applied  to be  an ERO  after 90  days. If  someone has                                                               
          applied but  the RCA  has not  certified an  ERO within                                                               
          270 days, the RCA shall form an ERO.                                                                                  
                                                                                                                                
     9:11:09 AM                                                                                                               
     SENATOR MICCICHE asked if the effective date of the bill starts                                                            
     the countdown for the required notification by the commission.                                                             
                                                                                                                                
     MS. MILLER answered yes. She continued.                                                                                    
                                                                                                                                
          Page 3, lines 13-17: Provides  a process for the RCA to                                                               
          waive the  requirement for a  given network to  have an                                                               
          ERO.                                                                                                                  
                                                                                                                                
     She  explained  that all  the  load-serving  entities within  the                                                          
     system  would   have  to  petition   the  RCA  and   explain  why                                                          
     establishing an ERO  for the network isn't  necessary. This looks                                                          
     to the  future and  provides an  opportunity for  the RCA  to not                                                          
     require an  ERO if the  circumstances of a particular  network do                                                          
     not warrant it. She continued.                                                                                             
                                                                                                                                
          Page 3, lines 21-22:  Emphasizes that all users, owners                                                               
          and operators  of an interconnected system  must comply                                                               
          with  [reliability] standards;  this includes  entities                                                               
          that are otherwise exempt from RCA regulation.                                                                        
                                                                                                                                
          Page  3, line  24: Changes  'adopted' to  'approved' to                                                               
          conform.                                                                                                              
                                                                                                                                
          Page 3, line  27: Technical change to  the structure of                                                               
          (g).                                                                                                                  
                                                                                                                                
          Page  4,  lines  2-3: Prohibits  standards  from  being                                                               
          designed   with  the   intent   to  require   enlarging                                                               
          facilities or new construction.                                                                                       
                                                                                                                                
     9:13:23 AM                                                                                                               
     Page  4, line  5:  Clarifies that  the commission  must                                                                    
     give public notice and hold  a hearing before acting on                                                                    
     a  reliability  standard filed  by  the  ERO. Adds  'or                                                                    
     reject' after 'approve'.                                                                                                   
                                                                                                                                
     Page 4,  lines 9-16: Lays  out the new process  the RCA                                                                    
     must undertake to modify a  standard. The RCA must give                                                                    
     the ERO an opportunity to modify the standard.                                                                             
                                                                                                                                
CHAIR COGHILL said this gives the ERO authority to oppose a                                                                     
proposed modification, but the RCA retains the ultimate                                                                         
authority.                                                                                                                      
                                                                                                                                
MS. MILLER agreed; the utilities felt it was important to have                                                                  
the opportunity for a back and forth process for modifying a                                                                    
standard. She continued.                                                                                                        
                                                                                                                                
9:14:44 AM                                                                                                                    
     Page 4,  lines 9-16: Lays  out the new process  the RCA                                                                    
     must undertake to modify a  standard. The RCA must give                                                                    
     the ERO an opportunity to modify the standard.                                                                             
                                                                                                                                
     Page 5, lines 4-5:  Clarifies that penalties imposed by                                                                    
     the  ERO  can  be  appealed  to  and  reviewed  by  the                                                                    
     commission.  [But penalties  imposed by  the commission                                                                    
     do not get reviewed by the commission.]                                                                                    
                                                                                                                                
     Page  5,   line  11:  Conforms  to   new  lettering  of                                                                    
     subsections enabling penalties.                                                                                            
                                                                                                                                
     Page 6,  line 1: Removed  a provision that the  RCA may                                                                    
     require  an  ERO  to obtain  a  certificate  of  public                                                                    
     convenience  and necessity  (CPCN). An  ERO is  already                                                                    
     required to  have a  CPCN under  Sec. 42.05.292  (b) on                                                                    
     page 2.                                                                                                                    
                                                                                                                                
     Page 6,  line 7:  Changes 'electric utility'  to 'load-                                                                    
     serving entity' to conform with defined terms.                                                                             
                                                                                                                                
     Page  6,  line  9:  Deletes  requirement  to  'prepare'                                                                    
     before  'file'. Specifies  that an  integrated resource                                                                    
     plan  must be  filed with  the  RCA as  a petition  for                                                                    
     approval.                                                                                                                  
                                                                                                                                
     Page 6,  line 11: Changes 'most  cost-effective manner'                                                                    
     to 'in a manner that provides the greatest value.'                                                                         
                                                                                                                                
          Page 6,  line 15: Adds  battery storage to  the options                                                               
          an integrated resource plan should consider.                                                                          
                                                                                                                                
     9:17:14 AM                                                                                                               
     SENATOR  MICCICHE noted  that this  does not  affect projects  in                                                          
     process, just future projects.                                                                                             
                                                                                                                                
     MS.  MILLER  clarified  that this  section  addresses  integrated                                                          
     resource planning  and what it  would include. The ERO  would not                                                          
     get started  on the IRP until  it has been certified  by the RCA.                                                          
     She suggested he  may be thinking about  the project pre-approval                                                          
     requirement that  goes into effect  on the effective date  of the                                                          
     bill, July  1,  2021.  The RCA must write  regulations addressing                                                          
     how to handle projects undertaken  between the effective date and                                                          
     the time an IRP is accepted by the commission.                                                                             
                                                                                                                                
     9:18:22 AM                                                                                                               
     MS. MILLER continued.                                                                                                      
                                                                                                                                
          Page 6, line 17: Changes 'at  the lowest cost' to 'in a                                                               
          manner that provides the greatest value'.                                                                             
                                                                                                                                
          Page  6,  line  18:  Adds  conservation  activities  to                                                               
          conform with  the options  an integrated  resource plan                                                               
          should consider.                                                                                                      
                                                                                                                                
          Page 6, line 19: Adds 'public' before 'notice'.                                                                       
                                                                                                                                
          Page 6, line 20: Changes 'submitted' to 'filed'.                                                                      
                                                                                                                                
          Page  6, lines  21-31: Incorporates  a new  process for                                                               
          the  RCA's  handling  of  a   petition  to  approve  an                                                               
          integrated resource  plan. Within  45 days  of receipt,                                                               
          the  RCA must  approve the  plan or  open a  docket for                                                               
          investigation. If  the RCA decides  the plan  should be                                                               
          modified,  it  must return  the  plan  to the  ERO  for                                                               
          changes.  The  RCA  retains  the  backstop  ability  to                                                               
          modify a plan.                                                                                                        
                                                                                                                                
          Page  7, line  10:  Adds 'and  greatest  value' to  the                                                               
          terms the RCA will define in regulation.                                                                              
                                                                                                                                
          Page  7,  line  24: Changes  'the  most  cost-effective                                                               
          manner' to 'a cost-effective manner'.                                                                                 
                                                                                                                                
     Page 7, lines 29-30:  Clarifies that refurbishments and                                                                    
     capitalized maintenance  do not require  preapproval by                                                                    
     the RCA.                                                                                                                   
                                                                                                                                
     Page 7,  line 31, to Page  8, line 6: Requires  the RCA                                                                    
     to adopt  regulations related to  project pre-approval,                                                                    
     including   defining  refurbishments   and  capitalized                                                                    
     maintenance;  giving   local  governments  jurisdiction                                                                    
     over  local planning  decisions; and  how the  RCA will                                                                    
     address projects that are  started before an integrated                                                                    
     resource plan is approved.                                                                                                 
                                                                                                                                
     Page   8,  line   11:   Adds   'above-ground'  to   the                                                                    
     transmission line description.                                                                                             
                                                                                                                                
     Page  8,  line 13:  Increases  the  length of  a  high-                                                                    
     voltage,   above-ground  transmission   line  requiring                                                                    
     project pre-approval from 5 to 10 miles.                                                                                   
                                                                                                                                
     Page 8,  lines 14-16: Separates  high-voltage submarine                                                                    
     or  underground  cables  from  above-ground  lines  and                                                                    
     requires pre-approval if longer than 3 miles.                                                                              
                                                                                                                                
     Page 8,  lines 17-22: Adds, to  projects requiring pre-                                                                    
     approval,   energy   storage   devices   and   reactive                                                                    
     compensation devices. Definitions are renumbered.                                                                          
                                                                                                                                
     Page    8,   line    30:    Changes   'certified'    to                                                                    
     'certificated'.                                                                                                            
                                                                                                                                
     Page  9,   line  2:  Renames  'bulk-power   system'  to                                                                    
     'interconnected    bulk-electric   system'    and   re-                                                                    
     alphabetizes the list of defined terms.                                                                                    
                                                                                                                                
     Page 9, line 4:  In definition for interconnected bulk-                                                                    
     electric system, clarifies  the interconnected entities                                                                    
     must be load-serving entities.                                                                                             
                                                                                                                                
     Page 9, line 20: Updates the  date by the which the RCA                                                                    
     must adopt regulations to July 1, 2021.                                                                                    
                                                                                                                                
     Page  9, line  25: Updates  the effective  date of  the                                                                    
     bill to July 1, 2021.                                                                                                      
                                                                                                                                
MS. MILLER said that concludes the summary of changes.                                                                          
                                                                                                                                
     CHAIR COGHILL  said he  was unable to  withdraw his  objection at                                                          
     this time because he didn't have  a quorum. He relayed that there                                                          
     would  be  public  comment  on  Friday  and  he  would  entertain                                                          
     amendments at that  time. He advised that he and  Ms. Miller have                                                          
     talked with all  parties to ensure that the changes  in Version K                                                          
     conform to what has been  discussed and answer the questions that                                                          
     have been brought forward.                                                                                                 
                                                                                                                                
     9:24:35 AM                                                                                                               
     SENATOR MICCICHE commented  that subsection (f) on  page 3, lines                                                          
     13-17,  was  an  interesting  addition.   It  says  that  if  the                                                          
     utilities  as a  group unanimously  agree  to go  in a  different                                                          
     direction, they have the right  to petition the commission for an                                                          
     exemption from the bill.                                                                                                   
                                                                                                                                
     MS.  MILLER  agreed  that with  unanimous  agreement  [the  load-                                                          
     serving entities  within an interconnected  bulk-electric system]                                                          
     would have the ability to petition  to waive the need for an ERO,                                                          
     but project  pre-approval would still  apply. She  explained that                                                          
     the provision  is trying  to account  for circumstances  that may                                                          
     exist  in  the  future  where  the  responsibilities  within  the                                                          
     network are well understood so there  is not the clear benefit of                                                          
     requiring formation of an ERO.                                                                                             
                                                                                                                                
     CHAIR  COGHILL  added  that  it   is  trying  to  allow  for  new                                                          
     production and laying out the rules.                                                                                       
                                                                                                                                
     9:26:53 AM                                                                                                               
     CHAIR  COGHILL reiterated  that public  testimony would  be heard                                                          
     during  the  next  hearing and  he  would  entertain  amendments,                                                          
     including the one previously described  to relocate the provision                                                          
     on page 1.                                                                                                                 
                                                                                                                                
     MS.  MILLER  agreed  that  there  would  be  several  fine-tuning                                                          
     amendments and  that testimony would  be taken  from stakeholders                                                          
     who would be directly impacted by the legislation.                                                                         
                                                                                                                                
     CHAIR COGHILL held SB 123 in committee.                                                                                    
                                                                                                                                
     SENATOR MICCICHE expressed the desire  to hear from the utilities                                                          
     and encouraged  robust participation. He stated  support for many                                                          
     of the improvements.                                                                                                       
                                                                                                                                
     CHAIR COGHILL  advised that the  CS was  posted to BASIS  and had                                                          
     been distributed to stakeholders.                                                                                          

Document Name Date/Time Subjects
SB 123 - Version K Workdraft.pdf SRBE 2/12/2020 9:00:00 AM
SB 123
SB 123 - Version K CS Summary of Changes M to K.pdf SRBE 2/12/2020 9:00:00 AM
SB 123